[ N.AM Manufacturing Sourcing — Est. 2026 ]

Bring it
back home.

Reshored matches your product with vetted manufacturers across the United States, Canada, and Mexico — so your supply chain runs on short trucks and verified capacity instead of ocean freight and hope.

Network · Q3 snapshot
Vetted facilities248
Median lead time4.6 wk
Avg. open capacity29.4%
States + provinces37
Reshored programs1,113
What you’re leaving behind →14-week ocean lead times/Tooling stranded overseas/Quality escapes you can’t audit/Tariff whiplash/A single point of failure/MOQs built for a factory, not for you/

Lead times in weeks

Domestic transit is measured in days. Reorders stop being a quarterly gamble on a container.

Capacity you can audit

Every facility is walked and verified — certifications, quality systems, and real floor time.

One resilient chain

Dual-source across regions so a single storm, strike, or tariff can’t halt your line.

§ 01

How reshoring works

01

Map the part

Send a drawing, a tech pack, or just a sample. A sourcing engineer breaks it into process, tolerance, volume, and compliance requirements.

02

Match the floor

We shortlist facilities from a vetted domestic network — scored on open capacity, certifications, and honest lead times, not brochures.

03

Prove the lot

Sampling, first-article inspection, and a paid pilot run land before you commit a purchase order. You see quality before you scale.

04

Move production

Transfer the tooling and ramp. Most programs reach full domestic volume in a quarter — with a freight map that fits on a truck, not a container ship.

§ 03

What comes home

68%
Average lead-time cut after transfer
4.6
Median weeks to first production lot
$0
Cost to get matched and quoted
1,113
Programs reshored to date
“We cut a 14-week import lead time to nineteen days and stopped wiring deposits to a factory we’d never seen.”
Priya Ramachandran · COO, Meridian Instruments
§ 04 — Start

Tell us what
you make.

No sales script. A sourcing engineer reads your intake and comes back with real facilities, indicative pricing, and honest lead times — usually within two business days.

  • No commitment, no cost to quote
  • NDA available before you share drawings
  • Human reply, not an autoresponder